Answer Posted / vijaykumarht
inverter: The proper meaning of inverter is a device which
converts dc into ac.
The inverter also contains a battery unit and an dc to to ac
conversion unit. when the power fails the inveter will
deliver power from switching from main source to battery
source. The switching time here is normally greater than 20 ms.
UPS: The proper meaning of this is a device, which delivers
power, even if the source power fails(Uninterrupted power
supply).
This is also contains the same thing as a inverter except
here the switching time from main source to backup source is
less than 10ms, so that the computer hard drives or an
sensitive power products should not be affected from this.
Depending on the switching time there is a online ups and
offline ups. off line ups is same as a inverter.
| Is This Answer Correct ? | 89 Yes | 20 No |
Post New Answer View All Answers
How convergengr of nr method is not dependent on selection of slack bus and how gauss siedel method depends?
which is better to use svc or synchronous condenser why ?
When a square wave is applied to primary of a transformer then what will be output wave form of secondary ?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
How much depth n width required for laying of 1X70 Sqmm Cable in Desert???
How to calculate approximate load loss of a distribution transformer by knowing %ge imp of transformer?
ho can we calculate the conductor insulation value according to their ratings like voltage,current etc.how insulation value related with voltage,current and power of amachine
Why cables and busbar both needed in LT Panels?
How much minimum insulation required between 11kv/3.3kv transformer windings?
how to set relay setting? and example calculation...
what are the application of over current relay?
What is called grain-oriented laminations?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
What is q factor?
if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)