How much time it will take to develop a report in real time?
It depends upon the complexity of the report, so tell me
the approximate time period for a simple list, cascading,
master-detail, drill-through,..…etc?
Answer Posted / beckham
As u have answered it depends on complexity...
simple list - 5 seconds...
master detail - 2 min
cascading - 3 min
drill through - 5 min
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What do you understand by the term 'dynamic cube'?
how u will determine the performence tune will occur either in report or system
What is the function of cognos dispatcher?
What are the different types of reports present in cognos?
What do you mean by drill across?
what is the difference between native sql and cognos sql?
How to join multiple db in catalog?
how to create measures and dimensions?
What is difference between informatica power mart and power center?
What do you understand by user class in cognos?
what is online view?
Define report item?
----------------Describe DWH Architecture?
3. The vice president of sales has requested a graphical display of the same information provided in our last crosstab report (whatever I mentioned in above question) for an up coming presentation. We need to provide a chart report that shows which regions generate the most revenue and sales volume.
can anyone provide link to download cognos 7.2 version for download along wiht installation and configuration steps tx in advance