If 5/2 artists make 5/2 paintings using 5/2 canvases in 5/2
days then how many artists r required to make 25 paintings
using 25 canvases in 25 days?
Answer Posted / swapna
25 artists are required..5/2x=25=>x=10=> 5/2x artists are
req==25
| Is This Answer Correct ? | 9 Yes | 10 No |
Post New Answer View All Answers
if the area of square increases by 69% then side of the square increases by:
Please provide me rs aggarwal verbal reasoning book link pleeeeeeeez
Find the Series number: 2,5,9,19,37,..
The minute hand of a clock overtakes the hour hand at intervals of 64 minutes of correct time. How much a day does the clock gain or lose?
The population of a city increases @ 4% p.a. There is an additional annual increase of 4% of the population due to the influx of job seekers, find the % increase in population after 2 years ?
In a class there are 45 pupil, out of them 12 are in debate only and 22 in singing only. Then how many in both?
Find the next series: SE QU EN TI ?
a number of subsets of a set s is 128, then s has
two workers can type two pages in two minuets then how many persons can type 18 pages in 6 minuets
If the circumference of a circle is 100 units, Then what will the length of the arc described by an angle of 20 degree ?
A boy asks the relation of two people walking along the street. One of them says that the lady walking with him is the daughter of his mother's only son. What is the relation between the two people?
Q1. Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line, .i.e the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The minimum value of n1(P) over all configurations P of 5 points in the plane in general position(.i.e no three points in P lie on a line) is
What is the total distance covered by Sachin if he covers 2/3 rd of the distance at 4 kmph and the remaining distance at 5 kmph in 1hr 24min?
how can i get previous ssc data entry question papers?... if u have any idea pls give me very kindly.....
A can do a piece of work in 30 days, which B can do in 20 days. Both started the work but A left 5 days before the completion of the work. It took how many days to complete the work?