prepare test cases for file copy paste.
Answer Posted / swapnil
hi i m swapnil
First i ask u all buuddy that is there not a mouse 2 use
right clik what we do
so we doing manual testing so go for key board n use short
keys also that's become good testcase
Answer:- First we select(control A) created file than use
short keys for copy(control c)option n than go 2 new
folder n paste(control v) there n check that whole file is
paste.
Test Cases are as fellows:-
1.check memory of folder(whole word)which we copy
2.check same file is paste
3.check copy the file or not
4.check paste the file or not
5.check same font of alphanumiric paste
6.check font size
2.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
How to find that tools work well with your existing system?
What is software review?
What r the documents required for performance testing
how to connect your project in database?
Give the real-time example for back-to-back testing?
Did any one completed CSTE certiication? can u send sample question papers? how to apply that? pls send it to my mail id - dsnathi@gmail.com THANKS IN ADVANCE
I need your help, actually am facing lots of problem in interview am not able to answer in right way what ever questions asked about project. Could you please answer few questions? You must have seen the project I have mention as current project so please help on this, tell me how to explain project in details am prepare on HR module but don’t know how to explain it properly. If you can send me few documents like SRS, and few test case that will help me to get the clear picture, and want ask u what is tier1, tier2, and tier3 in project.
Which model is following in your company for developing software?
How much the bug is affecting the functionality of the application?
How many bugs occured will be considerd appropriate over 1000 steps when inspecting software? Describle an approriate Bug value.
How can software qa processes be implemented without stifling productivity?
1.For a single module how many builds are possible 2.what will be the max or min time to finish up an single module
How to integrate Bugzilla with QTP?
what is the test plan of facebook?
how agile testing is performed and what are the related documents.