how do u migrate BO 6.x to XI ?
Answer Posted / naveen
Hi Kshatri, this is Naveen, I have working knowledge in BO
XI. But I am into a new project and I want to know the
steps to migrate from BOXI R2. Could you please send the
pdf to ng62245@gmail.com
Thanks
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Can we Save (save as) WEBI Doc as DESKI?
How can you first report in Business Objects by using broadcast agent?
please explain me with the real time tables on how aggregate tables are created and how aggregate awareness is addressed to it.
Explain in detail about type 2(scd),
Explain are data mart and dwh normalized or denormalized? Do both of them exist in the same tier?
1)I have createcd a dashboard on Bex query. How to refresh the Dashboard without hitting the bex query? 2)What is Event based scheduling in BO? 3) How to display the BO webi report title using a function? 4) For eg in my webi report iam having a person name like Jhon Peter Adam. But i need to get only the middle name of the person like Peter. What function is used in Webi to get this?
What would you consider as your biggest achievement and why?
Tell me a business scenario where I can achieve the data through MINUS only not through subquery.
What is the profile and package?
what is universe null
how to prepare the documentation in business objects and where to get the requirement?
How can we do load testing for webi reports? (Example if I have have to test one webi report for concurrent users refreshing report at one time)?
Explain what sort of existing documents should business analysts refer to when starting on a new project?
In source system we have os - windows BO - 5.1.5. with webi 2.7.1 Repository database - oracle Reports database - Oracle and DB2 Nearly we have 1200 reports in present system , i want to move as it is to new hardware os- windows bo- 5.1.5 with webi2.7.1 repository - oracle reports - oracle and db2 let me know is there any migration techniques in same version. thanks in advance Usha
How to create a new calendar in CMC? Can u please tell me the process to create the required calendar. Ex:- Year of that calendar to start with Jan-15 and ends with Jan -30 and the Next month to start with Feb-31 and ends with Feb-14.