Answer Posted / shailesh bhat
IT IS BASICALLY AN INDEX NUMBER THAT GIVES A GOOD IDEA
REGADING THE FINENESS OF SAND.IT IS ON THE BASIS OF FINESS
MODULUS THAT SAND HAS BEEN DIVIDED INTO Zones.THE F.M OF
SAND RANGES FROM 2.2-3(APP.)
Is This Answer Correct ? | 77 Yes | 23 No |
Post New Answer View All Answers
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
Will going from a 3-tap to 6-tap increase water pressure?
Types of column foundation and how to calculate its steel quantity.
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
How much does the leaning tower of pisa lean?
How many kilo-newtons equals 1000 kilogram?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
what is raft foundation
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .