Which IS code is saying the detail of deshuttering period?
Answer Posted / raveendra
IS 456-2000
| Is This Answer Correct ? | 57 Yes | 4 No |
Post New Answer View All Answers
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
What are the advantages of cad software?
How much cement and sand required for 9"brick wall per square metre
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
WHAT IS YOUR EXPECTED SALARY?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
how to calculate reinforcment in staircase cranked beam?
which has high compressive strength between hollow block and brick masonry?
In reclamation works what are the importance of geotextiles and sand?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
Describe a time when you anticipated potential problems and developed Preventive measures