Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is entry criteria for intigration testing,,?
what is entry criteria for system testing?
what is exit criteria for intigration testing & system
testing??? plz give me proper examples ....
thanks & regards
svsekhar2003@gmail.com

Answer Posted / siva

Entry Criteria for Integration Testing is "All Components
have Passed in Unit Testing".


Exit Criteria is "Test Suite Passes"

ntry Criteria: The conditions that must exist before a unit
of project work can commence.

Exit Criteria: The conditions that must exist before a unit
of project work can be deemed complete.



Entry Criteria for Unit testing phase are:

The following documents have been completed, reviewed and
approved:

1. Business Requirement Document complete

2. Program Required Documents complete

3. Preliminary Software Development Project Plan

4. Phase 1 Planning

5. Functional Specification

6. High-Level Design Specifications

7. Software Development Project Plan approved

8. Software Verification Plan approved

9. Software Configuration Management Plan

10. Quality Assurance Plan approved.



Exit criteria for the Unit testing phase are:

1. Unit test has been passed

2. The module resides in a baseline directory

3. The project is code-complete. There are no missing
features or media elements

4. All priority a bug have been fixed and closed

5. Internal documentation has been updated to reflect
the current state of the product. Note: Unit testing will be
performed mostly by the Developer.



Entry Criteria for Integration testing phase are:

1. The project is code-complete. There are no missing
features or media elements

2. The product satisfies the performance and memory
requirements specified by the Functional Spec.

3. Software/Curriculum have run and passed a Sanity
Test that has been provided by the QA group.

4. All priority a bug have been fixed and closed

5. Internal documentation has been updated to reflect
the current state of the product.

6. Curriculum has done a content review of the
lessons.



Exit Criteria for Integration phase are:

1. The Integration engineer has tested for install
ability.

2. All priority a bug have been fixed and closed.

3. Internal documentation has been updated to reflect
the current state of the product.

4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.



Entry Criteria for System testing phase are:

1. QA has spot tested content, features, and
functionality of the product and verified that it is
feature-complete.

2. The user interface and the feature set are frozen.

3. The final CD-ROM layout has been determined.

4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.

5. The Integration engineer has tested for install
ability.

6. All priority a bug have been fixed and closed.

7. Internal documentation has been updated to reflect
the current state of the product. Exit Criteria for System
testing



The Exit Criteria for the System testing phase are:

1. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.

2. All priority a bug have been fixed and closed.

3. The software runs on all the product’s supported
hardware and software configurations.

4. The product is compatible with third-party products
as specified in the Functional Spec. Final Entry Criteria



The Entry Criteria for the Final phase are

1. Quality Assurance Plan approved.

2. The work has been approved and signed off by
Product Marketing

3. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.

4. All priority a bug have been fixed and closed.

5. The software runs on all the product’s supported
hardware and software configurations.

6. The product is compatible with third-party
products as specified in the Functional Spec.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference between web site testing, desktop application testing and wireless application testing? what is the difference in testing strategy to test them?

2123


What is a critical bug?

1088


what are the common errors while doing integration,system,functional,regression,user acceptance testing? can anybody please let me know the answers it is too urgent???

2051


Plz give me manual testing real test case ?

1568


How to write test cases for nevigating menus? Ex. Course -Topics -Subtopics

2204


According to RBI rule how much money can be transferred through online banking at one time...?

2905


After insert the record in front-end, how will you check the back end by manually? Please explain?

1084


What is quality center? What are the modules of quality center?

1100


What can you tell about the project if during testing you found 80 bugs in it

2295


Explain thread testing.

1072


What is Stability and Performance Testing in Testing the TV

2352


How does your preferred work style work with the ideal test-manager role that you just described? What is different between the way you work and the role you described?

2176


In which all places, testing is done?One is from the server by calling server name.Can u suggest others?

1965


what are the possible test cases for online jobs search portal..if its a job seeker module and any 1 if u had worked on this proj pls share the bugs with sev and priority pls frends i need replies for these queries ..thanks in advance

7614


wht is Manual Testing Frame work

2116