Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is entry criteria for intigration testing,,?
what is entry criteria for system testing?
what is exit criteria for intigration testing & system
testing??? plz give me proper examples ....
thanks & regards
svsekhar2003@gmail.com

Answer Posted / siva

Entry Criteria for Integration Testing is "All Components
have Passed in Unit Testing".


Exit Criteria is "Test Suite Passes"

ntry Criteria: The conditions that must exist before a unit
of project work can commence.

Exit Criteria: The conditions that must exist before a unit
of project work can be deemed complete.



Entry Criteria for Unit testing phase are:

The following documents have been completed, reviewed and
approved:

1. Business Requirement Document complete

2. Program Required Documents complete

3. Preliminary Software Development Project Plan

4. Phase 1 Planning

5. Functional Specification

6. High-Level Design Specifications

7. Software Development Project Plan approved

8. Software Verification Plan approved

9. Software Configuration Management Plan

10. Quality Assurance Plan approved.



Exit criteria for the Unit testing phase are:

1. Unit test has been passed

2. The module resides in a baseline directory

3. The project is code-complete. There are no missing
features or media elements

4. All priority a bug have been fixed and closed

5. Internal documentation has been updated to reflect
the current state of the product. Note: Unit testing will be
performed mostly by the Developer.



Entry Criteria for Integration testing phase are:

1. The project is code-complete. There are no missing
features or media elements

2. The product satisfies the performance and memory
requirements specified by the Functional Spec.

3. Software/Curriculum have run and passed a Sanity
Test that has been provided by the QA group.

4. All priority a bug have been fixed and closed

5. Internal documentation has been updated to reflect
the current state of the product.

6. Curriculum has done a content review of the
lessons.



Exit Criteria for Integration phase are:

1. The Integration engineer has tested for install
ability.

2. All priority a bug have been fixed and closed.

3. Internal documentation has been updated to reflect
the current state of the product.

4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.



Entry Criteria for System testing phase are:

1. QA has spot tested content, features, and
functionality of the product and verified that it is
feature-complete.

2. The user interface and the feature set are frozen.

3. The final CD-ROM layout has been determined.

4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.

5. The Integration engineer has tested for install
ability.

6. All priority a bug have been fixed and closed.

7. Internal documentation has been updated to reflect
the current state of the product. Exit Criteria for System
testing



The Exit Criteria for the System testing phase are:

1. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.

2. All priority a bug have been fixed and closed.

3. The software runs on all the product’s supported
hardware and software configurations.

4. The product is compatible with third-party products
as specified in the Functional Spec. Final Entry Criteria



The Entry Criteria for the Final phase are

1. Quality Assurance Plan approved.

2. The work has been approved and signed off by
Product Marketing

3. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.

4. All priority a bug have been fixed and closed.

5. The software runs on all the product’s supported
hardware and software configurations.

6. The product is compatible with third-party
products as specified in the Functional Spec.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

user id @ yahoo.com (or) yahoo.co.in (or) gmail.com.... etc

2335


List the type of testing perform to test microsoft excel 2003 give atleast 1 example of each type

1902


Any one please can u tell me what is composer? An interviewer asked me do u have experience in Composer? its urgent.

2016


1.What is configuration Management? 2. Explain Impact Analysis 3. Explain Peer Review 4. what i kickoff phase of Formal Review. 5. Whatv are the phases of fundamental test process. 6. what is state transition testing. 7. what is LCSAJ 8. Test conditions are derived from where?

1957


explain fish model in detail?

2149


If you are handling a product testing and if there are around 100 test cases and in them few test cases are failed then at the end of the day how will you treat whether the product is pass/fail.? consider the failed test cases are in functional requirements.

1977


What is back to back testing?

1972


What is virtual creation tool?

1988


When we are recording in WinRunner and interact with the AUT, what does WinRunner do?

1966


what the purpose of requirement phase

13728


How to test an application if it was already developed and it is in the state of changing the functionality according to the customer requirement How to start testing in this situation. I got an application to test.It is a desktop application.It is still developing and started 8 months back.how can i start to test this application? Is it the right way to test it in "Random testing"? or writing the testcases from page one and executing them.i have an another responsibility that is I have to automate that application. can anyone tell me what is the process to test this application.

1984


What is an inspection in software testing?

1161


Why should you care about objects and object-oriented testing?

2350


What is Mixed Testing

2014


types of reviews?Advantages of reviews? Diff between process and procedure? diff b/w verification and validation? diff b/w cmm,cmmi? exp tqm,gqm,iso,ieee? Roles and responsibilities of tester? Ricks,types of ricks? what r Quality factors?

2185