Answer Posted / maran
MRP-Material Requirement planning.It is used for multi
lelvel planning.But MPS is used for critical level or
single level planning.planning time fence is must for mps
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What do we do in realization phase?
Explain how ‘pp’ is ‘integrated’ with other modules?
what does SAP business workflow do?
Explain why there is need of production version?
Explain variant configuration
After doing realization how we will check whether it is working or not?
What is requirement class and requirement type?
Differentiate ‘variant bom’ from ‘multiple bom’?
Explain the lsmw and the steps involved in them.
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What happens to plan after it has been converted into production order?
How to create prt master records?
Overlapping and splitting, where do you assign?
what are the problems you faced in MRP?
What are traffic lights in mrp?