what is the use of choke on tube light fitting
Answer Posted / dileep
At the time of starting a tube choke gives rise to high
voltage by di/dt nearly 1000 volts by starter ON-OFF
function rate of change of voltage becomes high due to
inductance of choke. This high voltage starts ionization of
gas in the tube. Once gas gets ionised and starts
conducting then starter gets out of circuit and circuit is
completed only through choke which now share voltage(limit
voltage) for tube because after esabilishing ionization now
to maintain it only nearly half of the voltage is required.
Is This Answer Correct ? | 260 Yes | 22 No |
Post New Answer View All Answers
Is neutral transformer can be called as control transformer?
What is the general power consumption rating of CPU CRT type and Flat type, Monitor,Printer, projector, Scanner?
What happens if we give the supply to the rotor of induction motor and make its terminal shorted?
Some times to change of DOR of a motor, interchange of R & B is not effected and RYB take same current, but interchange of R&Y is effected ie change the DOR. My doubt is what is the problem in motor and how it is happen.
why EMF IS INDUCED IN A CONDUCTOR WHEN FLUX LINKING WITH IT CHANGES ACCORDING TO FARADAYS LAW.
what are the breakdown voltage rating of mini- curcuit'transfarmer!
Which types of gate insttaled in static switch. Please give me answer.
comparision between ACB and VCB
Why delta star trformers are used for lighting loads?
what is meant by directional earth fault and non directional earth fault? describe both.
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain
for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?
Meaning of ingrace protection for motor.for ex IPXY
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?