Consider if there is no Test lead, No Test Manager and QA
Manager. If you are the senior test engineer, you are
getting pressure from the client to give the build. But you
see that, there r 5 high and 5 low sevierity bugs. So, what
you will do and how you interact with the client.
Answer Posted / deepti
The criticality/severity and the impact of the bugs should
be communicated to the Client.
Incase the client agrees to receive the build as it is, the
documented concent should be taken along with the schedule
implications.
No client wants a low quality build-specially if it can
lead to system failure. Convince the client and deliver
correct tomorrow rather than delivering incorrect today-
its a matter of reputation, not time.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How do u prepare test environment for ur application?
14.What is function point breakdown?
What is internationalization testing (i18n testing)?
What is the most important phase in STLC and Why
do we need to write test cases for workflow of the product for instance: there is 2 module "TRAINING ASSIGN MODULE" and "EMPLOYEE" in TRAINING assign MODULE iam assigning training to employee setp is 1.selct traning "oracle" 2.select employee u want assign "peter" 3.apply. now to check whether training assign or not GOTO EMPLOYEE module 1.click on "peter" 2.click on 'view assign to employee'link.now this is a flow do i need to write test cases for this fllow.plz help me guy mail me nirmal_rawatt@rediff.com
Can you explian $ pillar of Agile
how many modules in ur bank project? what functionalities r there?how did u check? could u plz expalin ur banking project?
Why documentation testing is important?
Difference between Re-testing and Regression testing?
What are the different available models of sdlc?
What is a code walk through?
How does your preferred work style work with the ideal test-manager role that you just described? What is different between the way you work and the role you described?
What do you mean by Unit Testing, Integration Testing, System Testing, and User Acceptance Testing and when do you do them?
What are the benefits of requirement traceability?
What and why is api testing?