Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is mean by CT Saturate? how do we calculate?

Answer Posted / guest

CT have some capacity to current carring at some voltage
level but some time we give more voltage to his capacity
that time ct passes more current up its capacity.

Is This Answer Correct ?    2 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

draw singleline diagram of star to delta and dol starters

2309


how point on wave controller works.

2652


we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?

1853


At what factor resistance r of a conductor depends?

1150


whats the existence of reactive power and when it arises?

2174


Why are short circuit ratings always 16kA,25kA,36kA and 50kA.Who has fixed these?

4341


What is superposition theorem?

1245


what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker

5483


How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.

1796


How to calculate phase to phase difference ?

2310


how is calculated the quantity of weight in hot test xlpe?

2556


what you have to see after one week or month from the day of installation of transformer ?

1753


Usually in the L & T make MCC feeders' power circuit,we have BMR after the MAIN CONTACTOR.,can we interchange their position, keeping the control logic same???

2175


Any Electrical Engineering jobs?Please refer for interviews. Thank you

1975


What is the general system requirement of alternator?

1901