How will you go with testing process if only project
requirements document is given to you
Answer Posted / suru
After getting the project requirement details we will first
try to list out all the technical details and then prepare
Architechture design for those specifications and Put it in
to first low level design and then in to proper Code
After Coding is done we will do following
a)Unit testing --For testing code on module level
b)Integration testing --Once module are integrated to form
system
c)System Testing ---Once the subsystem are combined to from
one end to end system or applicaion
d)Acceptance Testing --Finally we will do acceptance
testing for the customer certification
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is functional testing terminologies
how to test ecg machine?
what is configuration management tool - send to thanu_santo@rediffmail.com. what is testing senarios
Which test cases are written first: white boxes or black boxes?
consider therez 1 land and it has mango trees in it, what are the tets cases or how will we count no of mangoes on all trees
What is remedy testing,expalim that and how can use that
wat are the questions would the project leader ask about the project?? please do send the answers early.
Which criteria should take in account while doing CMS testing of any project?
i want manual and automation test cases and interview questions
What about the test case if the field only takes a certain number of characters or a minimum number?
What knowledge I must have as a 3 yrs. manual tester??
What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)
What are noise variables?
What is a code walk through?
What is boundary value testing? Give an example.