Answer Posted / nanduri k. prasad
NETCH: It net change planning done for the most recent
changes taken without considering the warehouse stock.
NETPL: It is the plan when gross requirements are to be
considered including the ware house stock.
NETPU: It is the plan considering the planning horizon.
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
What happens to planned after it has been converted into production order ?
What is the need of mrp list if the stock requirement list is already given?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
In implementation stage tell some standard scenario before AS-Is & TO-BE
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
If u maintain sub-contacting where and how will be reflect
What is MTS and MTO and the difference between them?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
How to create opbject dependencies in a bom for a configurable material?
what are the constraints of Variant configuration?
Explain the gaps and the steps involved in them.
What is detail scheduling
What are the types of master views for production and planning?
Explain transaction code KO88 or CO88.
How did you configure the payscale structure?