Answer Posted / nanduri k. prasad
MPS :- Master Production scheduling is generally done for
when the product groups exists. By doing MPS we basically
disagreegate the group requirements into individual product
requirements. By doing MPS we can disagreegate the plan and
we can only creat planned order for finished products.
MRP :- Materials requirment planning is done to drill down
for individual product once the planned orders for finished
products are created by MPS. However, we can use only MRP
for any individual material anytime.
| Is This Answer Correct ? | 19 Yes | 9 No |
Post New Answer View All Answers
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is the use of mrp group?
Explain how can you create production order without routing and bom?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What are all the ‘technical types of bom’?
What is phantom item & sub contracting
Can't one material be assigned to more than one operation in a routing, why?
In project the customization is comes under which phase?
Can any body explain me why work scheduling view is required for semi finished and finished products?
List out the basic procedure for dispatching operations in capacity leveling?
One component we can assign to workcenter at routing
Do you have any idea about Capacity Planning?
Explain Planning file entry.
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?