how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant
Answer Posted / nanduri k. prasad
There are different methods of doing product cost estimate.
e.g., Std. cost estimate or variable cost estimate.
From the BOM and routing the total no of components used
for that product is calculated using the price mentioned in
accouting views and from routings each operation cost is
calculated from the activity types defined in workcenters.
Collectively this cost is displayed in Product cost
estimate as cost of manufacture in the T.code CK 11n.
In case of variable cost, all the variables are considered
for the production order and the actuals are considered for
calculating the product cost. It is also posible to have
cost estimates and actual costs from which we can find the
variances.
| Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
Scheduling times can be defined in the material master record by?
How the processing time is calculated in a wc when both labor, machine categories exist?
Difference between Item categories or what is variable size item or non stock item.
What is sla (service level agreements)?
What is 'capacity planning'?
Mention what is the use of t-code cs20 in bom?
What is it 41 used for?
Explain the planning steps for 100 products?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What is SOP and types of SOP?
Explain the mrp list and their uses.
List out the activities carried out in production planning?
Which BOM item category you have used?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?