how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant

Answer Posted / nanduri k. prasad

There are different methods of doing product cost estimate.
e.g., Std. cost estimate or variable cost estimate.

From the BOM and routing the total no of components used
for that product is calculated using the price mentioned in
accouting views and from routings each operation cost is
calculated from the activity types defined in workcenters.
Collectively this cost is displayed in Product cost
estimate as cost of manufacture in the T.code CK 11n.

In case of variable cost, all the variables are considered
for the production order and the actuals are considered for
calculating the product cost. It is also posible to have
cost estimates and actual costs from which we can find the
variances.

Is This Answer Correct ?    16 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what do you mean by opening periods

598


List out the basic procedure for dispatching operations in capacity leveling?

631


What are all the ‘technical types of bom’?

642


Difference between byproduct and co-product.

1115


Explain what happens to plan after it has been converted into production order?

627






Mention what are the types of master views for production and planning?

589


What is the need of mrp list if the stock requirement list is already given?

606


What is MTS and MTO and the difference between them?

1939


What is the planning time fence?

605


What is collective order. Pre requisite of the collective order?

2091


Differentiate ‘variant bom’ from ‘multiple bom’?

664


Explain schedule margin key

630


Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?

585


what are the problems you faced in MRP?

1433


How requirements( pir,sles order, customer requirement) are reduced after they are produced?

624