In the Capability Maturity Model, at which level is
effective measurement mastered?
1. Level 1
2. Level 2
3. Level 3
4. Level 4
5. Level 5
Answer Posted / deepshikha
Effective Measurement is monitored at all levels. After the
achievement of first level, effective measurement is
monitored for the next level.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Explain dynamic testing?
hi everyone i want to download test director,winrunner,qtp latest versions pls help me
How you will write test cases for integration testing?
What is software requirements specification?
Explain unit testing?
What is the dfd (data flow diagram)?
IF i have two columns in Database , While using Database output value ,allthe values in the two column are set as a single row in the QTP datatable, can u suggest me a idea so that QTP Runtime datatable displays the values as it is in the database
What is Test Script Planner
The purpose of the requirement phase is
What is Mainframe testing all about? What is testing methodology which applies to this kind of testing? Can anyone with the basic knowledge of mainframe system can apply for the Mainframe testing job requirement?
What is difference between Agile and V model? Explain
How you would allocate a task to team members?
What is the main goal of defect prevention meeting?
What is functional system testing?
What n+1 testing is?