In the Capability Maturity Model, at which level is
effective measurement mastered?
1. Level 1
2. Level 2
3. Level 3
4. Level 4
5. Level 5
Answer Posted / deepshikha
Effective Measurement is monitored at all levels. After the
achievement of first level, effective measurement is
monitored for the next level.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Explain path testing?
Can you test a program and find 100% of the errors?
What n+1 testing is?
When should 'regression testing' be performed?
In a reactive approach to testing when would you expect the bulk of the test design work to be begun?
Test engineer?
hi friends pls send to me any one have or guide me for model papers or previous papers of ISTQB certification exam foundation level
What is 2 tier and 3 tier application? Pls illustrate it with appropriate example.
Explain dynamic testing?
What makes an inspection different from other review types?
What is cause-effect graphing?
What are validation and verification?
What is v- diagram (model)?
Suggest some good webinars on Testing concepts?
When should exploratory testing be performed?