Answer Posted / kumar
: Material Master - MM01
2: BOM creation - CS01
3: Work Center creation - CR01
4: Route creation -CA01
5: PIR Generation -MD61
6: MRP Run - for Total Planning - MD01
for Single-Item, Multi-Level - MD02
7: Evaluation through MRP list and Stock requirement list -
MRP List -MD05,
Stock Requirements List - MD04
8: Conversion of Planned order to Production order - With a
planned order -CO40
With material - CO01
9: Order management - Change >With material CO02
10: Confirmations- For order CO15
For Operation -For time ticket -CO11N
11: Goods issue - MB1A--261Movement type
12: Goods receipt - For Order MB31
13: TECO or Close Order- from Prod. Order Header menu.
| Is This Answer Correct ? | 39 Yes | 5 No |
Post New Answer View All Answers
What do you mean by pooled capacity?
Checkdigit example
Define gaps.
What is the production process in sap?
What is group bom?
what are the settings needed for variant configuration?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Mention what are the keyfields found in mrp view 1?
What are the ‘bom categories’ supported by sap?
What is the data you give in SOP
What are all the 'sub-components' of production orders?
If u maintain sub-contacting where and how will be reflect
What is mrp list and what is the use of it?
what is group bom? Is it possible to attach the drawing for a material to bom? How?