Answer Posted / rajasundar
The initial stage of testing starts with the study phase..
i.e. Understanding the scope of the project.
In this phase you clear your assumptions and questions with
dev.This is very important.
Note: Not only the project knowledge but the other 3rd
party products involved(for ex. your product may interact
with MS Sharepoint or exchange Server so that knowledge is
also necessary).
2.After understanding the scope of the project you need to
write test Plan.
3. In parallel develop Test outline ->test scenarios ->test
cases.
4.Review the Test Plan and Test Cases (Peer review) and do
the rework if any.
5. Freeze the Test Plan and Test Cases. If you have any
repository like TD or QC then upload your Test Cases.
6. Map your Test Cases with Requirements you alredy fed in
the repository.
7. Prepare the Test Environment Setup and Data Setup.
8. Prepare your documents need from testing like
Trackers,etc..,
9. Start Testing.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How to do manual testing of a E-insurance project (end to end process)
can someone give me a brief idea about embedded testing.. i know both embedded system concepts and testing concepts.. i just want to know what we have to do for embedded testing
What are the differences between stlc and sdlc?
Difference between smoke and sanity testing
What is your Approach when you find 10 Sev-1 bugs in 50 test cases?
what risks do u faced u r projest how do you solve
Describe your experiences with code analyzers.
i have source and target having same data structure 500 fields and one lacks records. how to validate data. write 5 scenarios.
Hi, this is murthysharma. I need very urgently about some terms which are used in use cases? Plz give reply to me, if any body know, It is really very very urgent. 1. what is the difference between basic flow,exception flow and alternative flow? 2.what are non-functional requirements in use cases? 3.what are exceptions, special requirements, business rules, assumptions, constraints. Kindly give me with the example. Bcoz, I am very new to this use cases. thanks in Advance. Regards, M.MurthySharma
what types of testing have u done in ur project?and expalin it detail?
If we have no srs, brs but we have test cases does you execute the test cases blindly or do you follow any other process?
Why it is recommended to add verification checks to your all your scenarios?
What icon is used in WinRunner to get an explanation of the syntax of TSL?
List the type of testing perform to test microsoft excel 2003 give atleast 1 example of each type
What type of projects can include in Logistics Domain? and what is the type of domain for project which include Driving license renewal, Different type of title registration etc...