Answer Posted / satish kakkirala
These two terms are used interchangeably to denote the
maximum power requirement of a system at a given time, or
the amount of power required to supply customers at times
when need is greatest. They can refer either to the load at
a given moment (e.g. a specific time of day) or to averaged
load over a given period of time (e.g. a specific day or
hour of the day).
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How you load a loadrunner agent?
When loadrunner is used?
how to get current system time Loadrunner function?
How is vugen script modified after recording?
Which loadrunner component does the recording of performance test scenario?
When you initialize the vuser what happen?
What is the loadrunner start-transaction and its syntax?
What is pause command?
What the host attributes determine?
What is the difference between performance testing and performance engineering?
How is automated correlation configured?
What is the think time?
What is the purpose of a loadrunner transaction?
How will you stop the execution of a script on error?
What is scenario default?