A, B and C contract a work for Rs. 550. Together A and B are
supposed to do 7/11th of the work. How much does C get?
(a) Rs. 270
(b) Rs. 200
(c) Rs. 310
(d) Rs. 175
(e) None of these
Answer Posted / azar
7/11*550=350
550-350=200
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
There are 5 boxes in a cargo. The weight of the 1st box is 200 KG, the weight of the 2nd box is 20% higher than the third box, whose weight is 25% higher than the 1st box weight. The 4th box which weighs 350 KG is 30% lighter than the 5th box. Find the difference in average weight of the 4 heaviest boxes and the four lightest boxes.
What is the value of a property, which has been insured at the rate of 1/6% of its value, if the annual premium paid on it is Rs. 83.33 (in Rs.)?
The average of the first 100 positive integers is?
If the product of three consecutive int is 210,then sum of the two smaller ints is:
1) 1)difference between ip and non ip protocol.
A man walks east and turns right and then from there to his left and then 45degrees to his right.In which direction did he go ?
A company installed 36 punching machines at the beginning of the year.In the spring they installed 9 additional m/c's and then discontinued 18 in the fall.How many were still installed at the end of the year?
Ms. Neelam deposits an amount of Rs. 16420 at simple interest and obtained 25451 at the end of 5 years. What was the rate of interest per year?
How would you measure 4 liters using jugs of 3l and 5l? Give a few solutions to this problem?
In a party there are women and cats.There are 18 heads and 72 legs altogether. How many women and cats?
There are two glasses, one is filled with orange juice and other is filled with apple juice both in equal quantities say 50 50 ml. 50% orange juice is poured in apple juice and than the 50% mixture of orange and apple juice is poured in the glass of orange juice. Now you have to find out how much orange juice is there in apple juice glass and vice-versa.
15 men take 21 days of 8 hrs. each to do a piece of work. How many days of 6 hrs. each would it take for 21 women if 3 women do as much work as 2 men?
A man while going down in a escalator(which is moving down) takes 50 steps to reach down and while going up takes 125 steps. If he goes 5 times faster upwards than downwards. What will be the total no of steps if the escalator were'nt moving.
In 80 coins one coin is counterfeit what is minimum number of weighings to find out counterfeit coin
There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?