9. Who is an ideal team worker according to you
Answer Posted / pravekumar
M.S.Dhoni
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
what is the equvalent indian material code for EN10025/2- S75JR
How much is the work done in isochoric process ?
What is breather frequency of tank?
What are the procedures of starting of diesel engine?
Explain how the cylinder lubrication on main engine is done?
What is isometric drawing?
What is the difference between isentropic process and throttlinglprocess ?
What is meant by lmtd?
what is the difference between fire grate in a boiler and the burner? and is the fire grate is the furnace of the boiler?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
what is the calculation of selection ofan capacity is 12000m3/hr.
What is the difference between blower and fan?
Which country has the worlds most powerful tank?
What kind of materials should be used for shafts manufacturing?
should cutouts made in main header of metal ducting be deducted from duct measurement.