What are the various methods for effecive earthing in a
factory in a rocky terrain, where soil resistivity is
extraordinarily high? The usual method of 3 m deep earth
pits is not serving the purpose.
Answer Posted / joby
here the soil resistivity is high. so mat earthing is provided
| Is This Answer Correct ? | 15 Yes | 4 No |
Post New Answer View All Answers
I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing
1.what is the difference between ct and cvt? 2.what is the difference between pt and cvt? 3.what is the difference between relays and circuit breakers?
How to calculate multiplying factor of dc energy meter
What is step signal?
what is positive , negative & zero equivalent system resistance
What is the count of hvdc transmission lines in india?
Where can i get practical knowledge of solar system?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
what are the components in electrical control panel (for example: 415V, 3-ph, panel to operate utility and 3-ph DG set).
why power not passes in plastic and rubber material
I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com
I want to know the 'Test voltage' for Tandelta testing of 3.3 / 6.6 / 11 KV Motors. Please explain
Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir
What is critical disruptive voltage?
How o select the electrical fuse?.What are its characteristics.How to select the material od fuse?