Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is full form of lv and mv? 2.while we connect
capacitor to generator what will cause for it?

Answer Posted / rajkumar r

LV-LOW VOLTAGE
MV-MEDIAM VOLTAGE

IF WE CONNECT CAPACITOR TO GENERATOR ADDITIONAL LOAD COME
UNDER DG MEAN TIME PF ALSO S IMPROVED

Is This Answer Correct ?    32 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

we need a ntpc previous papers

1992


Star Delta Diagram with full description

2441


CBCT selection

2325


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1939


WHAT IS LOAD CELL

2196


i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.

1856


does buccholz in a transformer use batteries

4974


What is the maximum breakdown voltage of 11KVA and 66 KVA power line and how it is calculated?

2353


Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.

5460


how we start 40w tube light with 4 diodes,2capacitors,1 choke and without starter.(a product avilable in market which lights burnt tube lights also)

2103


In what condition the HT fuse breakes?

2085


we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain

2274


Plz tell me how we can find that particular company has vacancy or not

2330


WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.

2213


hello everybody. what does an abnormal stator winding impedance or dc resistance show? thanx

1968