To calculate CFM for any unit or say a room with dimensions
as L x B X H.... then for this room the total CFM for air
duct should be equal to
1. Total Volume x 6 .............. for Private Room
2. Total Volume x 12 .............. for Public Room

Is This Answer Correct ?    29 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

2923


An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

1555


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1333


How do we calculate absolute pressure?

778


HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

1738






how do you calaculate the total steel quantity of an rcc building using thumb rule?

3203


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1432


What is the outturn of Ceiling plastering

2860


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1348


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

1667


How to find beam R/F cutting length

1242


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2270


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

1855


What is limit state method and working stress method and ultimate method

1140


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1676