Hi My question is, when u involve in a real time project
how did involve(role) from the begining to at relase the
product what risks and steps takes ? plz only for real
timers, i dont want bookish knowledge (Chandana) prf ble to
Ans this one for Mr Srinivas,Mr Ajay etc.... Thank u
Answer Posted / satishreddy mandadi
When you are involving in to the project. First of all you
need to know the Basic architecture of the application and
need to know about the Servers.
And you need to know the protocol level like which protocol
is intercting.
Performance testplan, baseline documents,Effort estimation
plans,Bench marking.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
While scripting you created correlation rules for automatic correlation. If you want to share the correlation rules with your team member working on the same application so that he/she can use the same on his workstation, how will you do that?
Which components have you used in loadrunner ?
What is manual correlation?
How can we recording vuser scripts using vugen?
How will you stop the execution of a script on error?
How is vugen script modified after recording?
When a scenario run exactly what happened?
what are the skip functions in Load Runner?
What do you mean by path?
For what purpose, user will be using ‘continue on’ error?
What is parameterization?
What is difference between manual scenario and goal oriented scenario?
What is wasted time in vugen replay log?
How to handle the encrypted values in correlation. please send me example with explanation
How to identify what to correlate and what to parameterize?