what is connection between test plan tab and test lab tab?
how can u access your test cases in test lab tab?

Answer Posted / purni

Hi
Test plan tab is used to create the test case and we
can also write step by step description of the test and the
expected results.
Test lab tab is used to execute the test case and log
the defects.
2. To access the test cases that are created by you is by
using your username and login.

Is This Answer Correct ?    25 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can we export multiple test cases from td in a single go?

817


How do I run reports from test director?

753


Can we export the files from test director to excel sheet? If yes then how?

823


Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?

1904


Explain about "Defect life cycle" in HP Quality Center ?

2033


How can we connect defect report from testlab&testplan tabs?

1757


How do we import testcases written in excel to test director?

809


How can we add requirements to test cases in test director?

773


What is the Change management ?

1760


Explain the procedure of connecting testdirector in qtp?

766


Can we map the defects directly to the requirements (not thru the test cases) in the test director?

820


How to use testdirector in real time projects?

853


How can we create our own defect template from test director? Is it possible in test director?

798


How do you analyze your test results? What metrics do you try to provide?

3134


What is Business Process?

1901