Explain Bug Life cycle
What is integration testing and regression testing
What is verification and validation
How does winrunner recognizes the project which is in
custom build
What is expert view and tree view
How does QTP identifies the project
What is the difference between Winrunner and QTP
What is Test Director and which version of test director
your are using in your project
What is a test plans
what are the contents present in a test plan
What is the risk of testing a project
Answer Posted / shyam
bug life cycle:
1. New: When the bug is posted for the first time, its state
will be “NEW”. This means that the bug is not yet approved.
2. Open: After a tester has posted a bug, the lead of the
tester approves that the bug is genuine and he changes the
state as “OPEN”.
3. Assign: Once the lead changes the state as “OPEN”, he
assigns the bug to corresponding developer or developer
team. The state of the bug now is changed to “ASSIGN”.
4. Test: Once the developer fixes the bug, he has to assign
the bug to the testing team for next round of testing.
Before he releases the software with bug fixed, he changes
the state of bug to “TEST”. It specifies that the bug has
been fixed and is released to testing team.
5. Deferred: The bug, changed to deferred state means the
bug is expected to be fixed in next releases. The reasons
for changing the bug to this state have many factors. Some
of them are priority of the bug may be low, lack of time for
the release or the bug may not have major effect on the
software.
6. Rejected: If the developer feels that the bug is not
genuine, he rejects the bug. Then the state of the bug is
changed to “REJECTED”.
7. Duplicate: If the bug is repeated twice or the two bugs
mention the same concept of the bug, then one bug status is
changed to “DUPLICATE”.
8. Verified: Once the bug is fixed and the status is changed
to “TEST”, the tester tests the bug. If the bug is not
present in the software, he approves that the bug is fixed
and changes the status to “VERIFIED”.
9. Reopened: If the bug still exists even after the bug is
fixed by the developer, the tester changes the status to
“REOPENED”. The bug traverses the life cycle once again.
10. Closed: Once the bug is fixed, it is tested by the
tester. If the tester feels that the bug no longer exists in
the software, he changes the status of the bug to “CLOSED”.
This state means that the bug is fixed, tested and approved.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Can you explian $ pillar of Agile
What are the types of maintenance?
whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?
What do you mean by Unit Testing, Integration Testing, System Testing, and User Acceptance Testing and when do you do them?
how to generate id in testdirector? a) Td id 1 b) td id 2 c) td id 3 d) td id 4 which is correct answer please any one of the tell me and mail me
What if the project isn’t big enough to justify extensive testing?
What is the difference between coupling and cohesion?
How to test an Scheduled event? For ex: in an investment banking application, the scheduler will create an equity anbd user has nothing to do but tester has to test if the instrument is created properly or not?
I am a ISTQB cerfity tester with 3 yrs experience(kolkata) , I left my current commpany due to some problem but since two months I did not get new job , why? is my age is 33 yrs and I am married . If anybody have any answer please let me know, my email id sangitadas1981@gmail.com/yahoo.co.in
How to do Performance Testing manually for a Flash Application?
how to explain banking domain project in testing?
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
Hello all, Can someone tell me what kind of questions i can expect from hiring manager along with two team members on final face to face interview for manual testing position.. I am switching from BA to QA as its better on benefits etc.. Thanks in advance
What is meant by Boundary value analisis and Equalence partitioning? Can give derive this using these methods? In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10% The next £28000 is taxed at 22% Any further amount is taxed at 40% Which of these groups of numbers would fall into the same equivalence class? a) £4800; £14000; £28000 b) £5200; £5500; £28000 c) £28001; £32000; £35000 d) £5800; £28000; £32000
What is the Testing strategy for testing client server applications/products?