can any body tell me integration between pp with fi,mm,sd.
Answer Posted / puru
pp integration with FICO isin work center in the screen of
cositng we have to assign work center with cost center
form here onlyalll the costing cale are taken
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what are the problems you faced in MRP?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
What is MRP Profile and MRP Group?
What is the transaction code to run MRP for sales order?
What are the levels of batch, explain batch determination process?
what are the settings needed for variant configuration?
What are basic dates?
Scheduling times can be defined in the material master record by?
Overlapping and splitting, where do you assign?
What do we do in the realization phase?
what are Standard keys
What is requirement class and requirement type?
What is the data you give in SOP
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
Do you have any idea about Capacity Planning?