can any body tell me integration between pp with fi,mm,sd.

Answer Posted / puru

pp integration with FICO isin work center in the screen of
cositng we have to assign work center with cost center
form here onlyalll the costing cale are taken

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.

1699


What is activity type and how it works in costing?

1246


What is 'capacity planning'?

694


What is Schedule Margin key. How floats works in scheduling?

2716


What is planning file entry

1995






How the processing time is calculated in a wc when both labor, machine categories exist?

750


Explain the planning steps for 100 products?

776


Integration between PP and QM Module.

1496


We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?

943


Define gaps.

741


What is a ‘routing’ in pp?

800


What is Inspection Points?

1165


How can you create production order without routing and BoM?

1180


Explain the process of Material costing.

1347


What are basic dates?

768