can any body tell me integration between pp with fi,mm,sd.
Answer Posted / puru
pp integration with FICO isin work center in the screen of
cositng we have to assign work center with cost center
form here onlyalll the costing cale are taken
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Why the work scheduling view is required for semi-finished and finished products?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
How system calculate the actual cost?
What is MRO area & MRP group & some difference
Different types of consumption based planning.
What is a 'product hierarchy'?
In implementation stage tell some standard scenario before AS-Is & TO-BE
Why work scheduling view is required for semi-finished and finished products?
Can we have more than 6 standard values in standard value key?
Which BOM item category you have used?
What is the t-code for changing production order and to display production order?
What are all the settings done for configuring the integration of pp with fico?
How to insert an inspection checkpoint at the end of an operation?
What is finite scheduling?
What is MRP procedure