can any body tell me integration between pp with fi,mm,sd.
Answer Posted / puru
pp integration with FICO isin work center in the screen of
cositng we have to assign work center with cost center
form here onlyalll the costing cale are taken
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is activity type and how it works in costing?
What is 'capacity planning'?
What is Schedule Margin key. How floats works in scheduling?
What is planning file entry
How the processing time is calculated in a wc when both labor, machine categories exist?
Explain the planning steps for 100 products?
Integration between PP and QM Module.
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Define gaps.
What is a ‘routing’ in pp?
What is Inspection Points?
How can you create production order without routing and BoM?
Explain the process of Material costing.
What are basic dates?