Answer Posted / sandeep
correct answer is y=2, x=6....
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?
The day before yesterday was WEDNESDAY then the day after 2morrow is?
Explain the Binomial theorem?
A triangle ABC is given, a line DE is parallel to base side and that cuts the triangle. The ratio of area of triangle to the area of trapezium given DE/BC= ?
Sunny ate 100 apples in five days, each day eating 6 more than the previous day. How many apples did he eat on the first day?
A is twice efficient than B. A and B can both work together to complete a work in 7 days. Then find in how many days A alone can complete the work?
need Thomson Reuters Questions and Answers
How many five digit numbers are there such that two left most digits are even and remaining are odd?
A beats B by 10 meters and B beats C by 15 metres the A beats C by
A 16 stored building has 12000 sq.feet on each floor. Company A rents floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
How many digits will be there to the right of the decimal point in the product of 95.75 and .02554 ?
The area of the maximum size of the circle described from the 10 square inch square?
A lorry starts from Bangalore to Mysore at 6.00 A.M,7.00am.8.00 am.....10 pm. Similarly one another starts from Mysore to Bangalore at 6.00 am,7.00 am, 8.00 am.....10.00pm. A lorry takes 9 hours to travel from Bangalore to Mysore and vice versa. A lorry which had started at 6.00pm will cross how many lorries.
if A = D, B=E, C=F, VWDUW = ?