Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1. Which Built-In-Function will you use to achieve the
following functionality? CLONO1NO2NO3
Factorl÷÷+OpcdeFactor2++÷ResultLenDHHiLoEq
C QTY IFLT *ZERO
C QTY MULT -1 QTY
C ENDIF
a) %ABS
b) %TRIM
c) %TRIMS
d) %UNS

Answer Posted / vipin

%ABS

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to call one program from another program in RPG? please help me with the code

1792


how do I preserve and clean the array?

1208


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

1301


thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400

2374


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2306


what happens when sflsiz = sflpag? What are the advantages and disadvantages?

1243


If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?

1169


What is ment by record level identifier?

1189


how can I tell when to replace the array?

1269


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

2063


How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...

1946


Set on command is used for closed all opened files , initialize var and release resource , return cmd is used for return to calling program but my req. Is dnt close opened files and resource must released while doing transactions , how can i do this...?

2141


what was the robotech rpg?

1269


How to write record if no field or the field are different in physical file in rpgle ?

1024


what is data area and how it is used in rpg program ?

1383