What is the Risk Analysis? Waht types of risk analysis are
there?
Answer Posted / rnashok
“Risk are future uncertain events with a probability of
occurrence and a potential for loss”. Risk identification
and management are the main concerns in every software
project. Effective analysis of software risks will help to
effective planning and assignments of work.
Categories of risks:
Schedule Risk:
Project schedule get slip when project tasks and schedule
release risks are not addressed properly. Schedule risks
mainly affect on project and finally on company economy and
may lead to project failure. Schedules often slip due to
following reasons:
1) Wrong time estimation
2) Resources are not tracked properly. All resources like
staff, systems, skills of individuals etc.
3) Failure to identify complex functionalities and time
required to develop those functionalities.
4) Unexpected project scope expansions.
Budget Risk:
1) Wrong budget estimation.
2) Cost overruns
3) Project scope expansion
Operational Risks:
Risks of loss due to improper process implementation, failed
system or some external events risks. Causes of Operational
risks:
1) Failure to address priority conflicts
2) Failure to resolve the responsibilities
3) Insufficient resources
4) No proper subject training
5) No resource planning
6) No communication in team.
Technical risks:
Technical risks generally leads to failure of functionality
and performance. Causes of technical risks are:
1) Continuous changing requirements
2) No advanced technology available or the existing
technology is in initial stages.
3) Product is complex to implement.
4) Difficult project modules integration.
Programmatic Risks:
These are the external risks beyond the operational limits.
These are all uncertain risks are outside the control of the
program. These external events can be:
1) Running out of fund.
2) Market development
3) Changing customer product strategy and priority
4) Government rule changes.
| Is This Answer Correct ? | 18 Yes | 20 No |
Post New Answer View All Answers
In QTP TEST DIRECTOR COMBINATION WHAT IS THE PURPOSE OF TEST DIRECTOR? In Somebody says to store test cases and design test cases.?ok fine , but In test director 5.0 , QTp not launching. what u do?
HOw to add the recovery file at runtime to the test file .
explain keyword driven framework with banking domain?
1.How do u prepare the test suits in QC? 2.How do u convert requirements to test plan in QC?
What is a reusable action?
how we implement share object repository in QTP 9.0 without using quality Centre , Explaine in brief
how to i add the values using the check points property?( i.e valid data(for valid data it's giving the footer message:value is added) and for invalid data: special chars, spaces,Duplicates and null values (in my page when ever we enter special chars, spaces and null values, it's giving the proper warning message and for Duplicates it's giving the footer message:"value already exists)?
Will there be any standards or requirements for page appearance and/or graphics throughout a site or parts of a site?
Limitations in QTP?
Explain in brief about the quicktest professional (qtp) automation object model?
How to modify object property in qtp ?
I had installed QTP 9.2. It is working fine but whenever I open QTP, it is trying to reinstall the below-mentioned files again and again "QTP92PS82UPGRADE.exe", "recogn.dll". If anybody has these files, please provide those files in this site or you can send that files to my mail id also (lravi4u@yahoo.com). If you don't know where the files will be in the QTP, search in the QTP software CD or path of QTP program installed (C:\Program Files\Mercury Interactive\QuickTest Professional)
Diff b/w test scenario's and test Procedures?
how can we compare descriptive programing with a regular expression
can any one say that where we can download the QTP trail version ??????????