Answer Posted / ranjan prasad
In my organisation no PLC is there for controlling the
logics in best optumum time and relible manner. PLC stand
for "programable logic controller".All word have its
specific meaning say
Programable- Means Any logic as per the process requirments
can be programmed in its controller.There are various way
of doing the programming like ladder logic programming,
control system programming and through Functional block
diagram.
Logic- All the process requirments are build into some
logic and it may be and , or , EX-OR, or combination of all
these.
Controller-All these programing is to be carried and saved
in CPU which is known as controller.
By the combination these it is called PLC
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
define superposition theorem thevnin theorem ,norton theorom?
How can we calculate the transformer rating if the load calculated is 1000KW (11Kv Supply)?
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero
What is meant by load angle of an alternator? Upon what factors does the load angle depend?
1.what is the funtion of chiller primary & scondary pumps. 2.what is the use of distribution lines & Types. 3.what is the use the thermal power stations & how much capacity.
i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice
hi frnds can any one help me ? plz send me placement paper of IOCL of Electrical streem .... plz send ....its urgent....
whether starting current is limited to rated current of motor through soft starting or it exceeds the rated current?
What the formula for calculating no.of earthings & size of earth strip for 100mX90m shop.
how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.
why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving
What are stable systems?
why ht cable end termination don't have a gland?
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
How we can recongnise the phase displacement of transformer connection between primary & scondary...plzzz explain it with example.........