Answer Posted / ranjan prasad
In my organisation no PLC is there for controlling the
logics in best optumum time and relible manner. PLC stand
for "programable logic controller".All word have its
specific meaning say
Programable- Means Any logic as per the process requirments
can be programmed in its controller.There are various way
of doing the programming like ladder logic programming,
control system programming and through Functional block
diagram.
Logic- All the process requirments are build into some
logic and it may be and , or , EX-OR, or combination of all
these.
Controller-All these programing is to be carried and saved
in CPU which is known as controller.
By the combination these it is called PLC
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what kelvin's law ?
1- What is the Polarization Index number be good for 15KV 3c#500MCM electrical cable? 2- Can I use the IEEE Std 43-2000 to perfom the PI test? Thanks
Why we use auxillary relay ? what is function of differential relay, directional o/c relay?
redundant connection in contactor?
How many types of electric motors are there?
when elecromagnatic waves are propogated in a wave guide?
Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?
Explain Even and Odd signals?
why ht cable end termination don't have a gland?
How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.
What should be the magnetic balance test values for a 3 phase delta/star connected single primary dual secondary winding transformer (90 MVA / 2 X 45 MVA TRANSFORMER)
TRANSFORMERS WITH DC SUPPLY
How calculated single phase induction motor req. Capacitor?
I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in
Difference between megger test equipment and contact resistance meter test instruments?