please give the description of stages of SDLC.And what is
feasibility study...?
Answer Posted / purnima
In SDLC there are six phases
1)initial Phase :-Intracting with clients and gathering the
requirements from clients by business Analyst and engaged
manager . they will prepare BRS (Business requirement
specification).
2)Analysis :-wheather that requiremnts are safficient or
not, to develop the application and test the aplication.
In this phase System anlyst,PM and TM prepare a resoure
plan and time plan.(It is temparvary plan).They will
prepare the SRS (system requirement specification).
3)Design phase :- Design the HLD( high level design) and LLD
(low level design) by chief architecture (or) technical
lead).Prepare the document TTD(Technical design document).
4)coding phase :- Coding developing according to the
particular requirements by programmers. Prepare the
document SCD( Source code document).
5)TEsting Phase :-Test the application by test eng .
provide Quality software.
6)Delevary to the client :- Deploy the software by SR.test
engg.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Explain virtual memory?
What is failure?
Explain glass box testing?
What are the major differences between stress testing, load testing, volume testing?
Explain what test plan is?
How will you recognise if a case is a 'test case'?
Does anyone have best practices for daily backup &restore process for qc 11 ?
what is automation testing process? What are the main steps invloved in it?
What are the maximum no. of devices supported in SCS-1,2 and 3?
HI, I am Praveen Saini having 5 yrs experience in s/w Testing field. I am looking change. I am having QTP 1.5 Yrs. + 3.5 Manual testing. If someone having position, lease let me know. sainipra@gamil.com 9811465496
What is the difference between top-down and bottom-up testing?
What is the role of moderator in the review process?
In which phase should testing begin – requirements, planning, design, or coding?
Hi do any one has dumps for ISTQB or ISEB exams for august or september exam 2013. Pleae mail qazwsx2631981@yahoo.co.in
Your audit indicates that the corporate quality management system did NOT work as it should have. How should this finding be categorized? 1. Minor nonconformance 2. Major nonconformance 3. Deficiency 4. Observation 5. Catastrophic failure