Whose responsibility is to create condition records,output
type ,output determination,condition table ,access sequence?
that is i want to know whether its a technical or functional
consultants responsibility ?
Answer Posted / venkat
it should be handled by technical consultants
| Is This Answer Correct ? | 1 Yes | 13 No |
Post New Answer View All Answers
Imagine that there is one sender and three receivers. While sending an idoc, how many idocs would be generated? Explain the flow from outbound to inbound system.
You want to create and send an IDOC to another the moment a PO is created in your system. How will you achieve this?
What do sm59 t-code stand for?
How do you send Idoc from a program?
What are sap ale converters? What are the minimum requirements for them?
What is a message type ?
What do we42 t-code stand for?
Explain the idoc base in idocs?
What are the advantages of ale?
What is a message control in sap?
Explain the multiple messages in idocs?
Differentiate between synchronous and asynchronous links.
What is an IDoc Extension?
What are the types of Ports?
What is a change Pointer?