if i have three programs progA,progB and progC .now i call
progB from progA. but the progB does not exist . now i want
to call progC instead of starting dump. how can we achieve
this.
Answer Posted / vinod babu
I m not sure about this answer. But my idea is dat we can
use ERROR HANDLING in main program. Suppose if the main pgm
does not exist then error routine will be handled and the
control passed to next statement after that routine.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How would display prime numbers using CL program?
What is the difference between copybooks and subprocedures in as400?
what happens when sflsiz = sflpag? What are the advantages and disadvantages?
what is an online rpg?
how do I preserve and clean the array?
How can we know running job is batch or interactive?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
What is the difference between iter and do?
what is a rpg?
What is difference between bind by copy and bind by reference?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
are there any useful c runtime apis that I can call from rpg iv?
can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com
How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...
How Chain operation copies the record's data to the input buffer for the program?