Hi My question is, when u involve in a real time project
how did involve(role) from the begining to at relase the
product what risks and steps takes ? plz only for real
timers, i dont want bookish knowledge (Chandana) prf ble to
Ans this one for Mr Srinivas,Mr Ajay etc.... Thank u
Answer Posted / ajay
See in real time u will be facing so many problems . first
of all you need to understand the architecture of the
application and then make sure that the environment which u
r working is similar to production environment then get the
specifications of that and then get the strategy document
then make a team and allot them some work.plan ur test by
keeping the deadline in mind. For everything make sure u
have a notes from the client.upto this layer u will come to
know when u do a project. then start ur scripting this part
u can try with any application(Yahoo). and the same case
with the execution as well.analysis is a typical part where
client will bounce on u with variety of questions. so we
got be confident enough in answering him.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How is vugen script modified after recording?
What is protocol function?
What are the different sections of the script? In what sequence do these sections run?
Hi all, I am new to Load Runner. I have run the load runner and i got analyzed reports/graphs. But i am very much confused about how to analyze those graphs. Can any one help me out this problem?
Hi all, I am having an interview on LoadRunner (SAP Web Protocol). I am wondering if somebody can help me with some interview questions at a 2 yr Scriptor level. Thanks and all answers are much appreciated.
How is each step validated in the script?
During the load test, what is the optimum setting for logs?
What is x-windows?
What are all the components of loadrunner?
What is lr-function?
What is the difference between transaction and transaction instance in loadrunner ?
What are the different types goals in goal-oriented scenario?
What is loadrunner controller?
What are different types of vuser logs which can be used while scripting and execution? What is the difference between these logs? When you disable logging?
While the script is running we find some values that may need to be correlated? Is it possible to do manual correlation for those values?