What is the difference between Post Goods Issue & Post
Goods Received.
Answer Posted / siddharth sridhar
PGI and PGR use 2 different movement types.
PGI decreases physical stock and PGR increases
In SD, PGI uses movement type 601 while PGR uses 561 (w/o
ref to PO/Delivery)
| Is This Answer Correct ? | 11 Yes | 9 No |
Post New Answer View All Answers
What is sap sd?
What is the relevance of 'Weight/Volume Relevant' tab in Credit Memo Request and Debit Memo request as in both, it is checked at item level? As I know, it is being used to re- determine route at delivery level.
How can you tell if a transport entry is in the process of being imported in sap ? : transportation management
Can you make texts mandatory for a customer master or a sales document?
The whse had to go to manual mode and we have been left with deliveries that were not created. Is VL10H the tcode I would use to upload data from an excel or text file to create the deliveries in mass? If so, what are the steps to follow? Thank you!
What kind of reporting and analytics capabilities does sap transportation management have? : transportation management
Can a sales area belong to different company codes?
what is the role of sap sd fuational consultant in IDoc prepairtion,explan the IDoc process ( my email id umerimran12@gmail.com.)Plz help sd gurus
At present we have the STATIC credit check, for only one customer we want DYNAMIC credit check from next month. no need to go for configuration ? only should go for master data for that only customer.
Describe the process flow for a credit memo.
what is the difference between sap credit memo request and sap credit memo?
In back order process system follows backward scheduling or forward scheduling? please give ur valuable answers
What is a company?
What are the three levels that copy controls are set up? And what are the transaction codes through which it could be done?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling