Answer Posted / mahesh wagh
when Material is rejected in quality management at that
time we reject vendor material so we give less amount for
rejected amount at that time credit memo is created. It is
one type of Subsequent credit but Subsequent is creat at
the time of less quantity receipt or some mismatch quantity
case.
Regards,
Mahesh wagh.
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
How do planned and unplanned consumption affect movement types?
Any good instructor in Noida for SAP MM ? There are lots of fake institute in Noida like Aptorn, Rector IT, Skyinfotech, etc. I have already been cheated by Aptron. Now searching any instructor who actually help to make my carrier in SAP MM Domain. If someone has any idea, pls inform me at 9811960753.
What is the difference between purchase requisition and purchase order?
I have created a new vendor. Later I found that there were some mistakes and that I want that the system should not allow me to make any po or post any entries to this vendor. How to deactivate this vendor?
What is the last step in the procurement cycle?
What are the mrp procedures available in mm-cbp (consumption based planning)?
What is the result of goods movement?
What are the main features of consignment stock?
Explain what is sap mm?
How is the mm module integrated with other modules of sap?
What is the differences between release procedure with classification and release procedure without classification? In which business scenario we use them?
What are the important steps in the procurement life cycle?
What information does the subcontracting info records contain?
Upto what extent we can increase the length of materials master short text.
What are the categories of purchasing information records?