there is any limit to display the members in rpg400?

Answer Posted / mohan

there is no limit

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to write record if no field or the field are different in physical file in rpgle ?

490


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1563


Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg

718


Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?

1455


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

517






during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.

755


how do I declare a minor?

718


What is difference between bind by copy and bind by reference?

1732


what are the key words you must use when using a subfile?

694


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1764


How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...

1314


How to call one program from another program in RPG? please help me with the code

1261


can I touch the array during treatments?

759


write an RPG program to calculate the marks of 5 students (A,B, C, D, E)in 3 different subjects (eng, math, sci) an display on the screen

831


When it is desirable to describe files Internally?

1190