Answer Posted / santosh k
Material master
Bill of material
Work centre
Routing
Prodn version
MRP
| Is This Answer Correct ? | 9 Yes | 3 No |
Post New Answer View All Answers
How to move to the realization phase?
What is opening period?
Do you have any idea about Capacity Planning?
What are all the ‘technical types of bom’?
What is Production scheduling Profile and use of it?
You want to insert an inspection check point at the end of an operation. How would you do that?
What parameters you maintain in “plant parameters” in configuration?
What are the types of master views for production and planning?
How many levels of Flexible Planning are there?
What is a ‘work center’ in pp?
List out the basic procedure for dispatching operations in capacity leveling?
How to create opbject dependencies in a bom for a configurable material?
What are the levels of batch, explain batch determination process?
What is the use of mrp pp evaluations?
Overlapping and splitting, where do you assign?