Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

condider as 100 w lamps glowing . for completing a one unit
how much time it should glow

Answer Posted / balakrishnan

As per basic electricity Concept 1 unit=1000 watts or 1KWH

Now we take 100 w/h load .Its mean it will
take 100w (electricity power consumed)by one hour and
respectively 200 w take two hours.....Finaly 1000w take 10
hours (without load interuption).

So it will take 10 hours

Is This Answer Correct ?    29 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do we calculate transformer oil in liter from the rating of the transformer.

1676


why connecting surge unit in contactor coil

1896


what happen when increase or decrease size of lamp,light.glass.

1924


How to choose size of the cable w.r.to current carrying capacity ...

2214


Installation resistance for whole installation of 16 kva & 25 KVA DTRA a) Between each conductor b) between conductor to earth c) installation resistance for each apparatus, each conductor to earth d) earth resistance for the system of earthing

1934


What is the difference between the impedance percent and impedance voltage ?

2216


l&t switch FN 63 handle position can we change

2569


What is the practical way to calculate the cable size for known ampere load?

1441


How can calculate the rating of a alternator for a given specific load with formula

2350


hwat type of motor is used in thermal gas turbine hydro nuclear power plants and why

1897


What is systematic error?

1382


Load break swicth maintenance procedure.

1777


what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group

2090


static chagre

2167


how can get electrical c licence.now i am working in spining mill , transformer capacity 2750KVA. SANCTION DEMAND 2250KVA. PLEASE ADVISE ME . MY CONTACT NO 09944226823

1802