can we use cl programming to update or delete physical files
Answer Posted / manish verma
Updation of any file is not possible through CL but if you
want to delete a file u can definately do it by using the
command remove member RMVM
| Is This Answer Correct ? | 5 Yes | 11 No |
Post New Answer View All Answers
do you use message subfiles? What are the necessary keywords required coding a message subfile?
What is the difference between copybooks and subprocedures in as400?
How would display prime numbers using CL program?
how do you use commitment control in rpg?
How to call one program from another program in RPG? please help me with the code
What is difference between bind by copy and bind by reference?
How can we override a file during runtime in rpg?
what are the key words you must use when using a subfile?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
what is a rpg?
what is file information data structure?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
how can I tell when to replace the array?
what is the rpg system?
what is program status data structure?