What is risk analysis,what type of risk analysis u did in u
r project
Answer Posted / sriharsha
hi.................(Must say u have a very good question )
Risk Analysis :
A systematic use of available information to determine how
often specified events and unspecified events may occur and
the magnitude of their likely consequences
OR
procedure to identify threats & vulnerabilities, analyze
them to ascertain the exposures, and highlight how the
impact can be eliminated or reduced
Types :
1.QUANTITATIVE RISK ANALYSIS
2.QUALITATIVE RISK ANALYSIS
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What processes/methodologies are you familiar with?
How we can test Cookies Manually?
How can I do Server side Interface testing in Web Testing?
What does entry and exit criteria mean in a project?
What r the documents required for performance testing
When did u complete testing ? Which scenrio should not be in automation testing ? why ?
What is black box testing, and what are the various techniques?
Upps..., sorry my email id is this : preet405p@yahoo.com Thanks in advanced.
What is ofx testing?
How can you do the scalability testing?
Difference between Stakeholder and Relevant Stakeholder?
How will you determine when to stop testing?
Can you explian $ pillar of Agile
what are metrics and what are metrics did u collect in you are project
What is the role of the test group vis-?is documentation, tech support, and so forth?