Answer Posted / fahmida
By scheduling the job through the director we can acheive
this
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Have you have ever worked in unix environment and why it is useful in datastage?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
Explain usage analysis in datastage?
Difference between ‘validated ok’ and ‘compiled’ in data stage?
What is the difference between account and directory options ?
What are the different common services in datastage?
how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.
Does datastage support slowly changing dimensions ?
What is active and passive stage?
What is a datastage job?
What is size of a transaction and an array means in a datastage?
Whats difference betweeen operational data stage (ods) and data warehouse?
What is ibm datastage flow designer?
Terminate Activity
Explain how a source file is populated?