can any body tell me integration between pp with fi,mm,sd.
Answer Posted / pravin
PP integrates with MM in 1-Mat. Master (MRP view-2)
Procuerment type to determine procuerment elememt.
2-Goods Movments i.e. Goods issue against prod. order/
S.O.
PP with SD-In Mat. Master (MRP view-3)i.e. while defining
strategy in planning.
PP with FICO- in Mat. Master i.e. Costing and accounting
views
| Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is MRP procedure
How system calculate the actual cost?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What do we do in the realization phase?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Can any body explain me why work scheduling view is required for semi finished and finished products?
In lsmw which is most important step?
What is it 41 used for?
What is mrp list and what is the use of it?
How many levels of Flexible Planning are there?
What is recursive BOM
Explain Flexible planning Procedure?
How did you configure the payscale structure?
What is scheduling