First window is registertion window where u will be having
the fields to entering the name,password and confirm
password and Ok button.After hitting the OK button it will
take u to 2nd window, wel come window for the user with the
msg welcome user.
3rd window will be login screen where u will be entring the
user name and password with out any mistake in case and
spell (i.e u entered correctly)and 4th window it shows that
user does not exits .What will be reasons? Other then data
base not connected.
Answer Posted / farzana
multiple reasons for this error msg
1. password has been expired without user knowledge (lay
off or more than 90 days)
2. Administrator locked him due to administrative reasons
3. His name might have accidently deleted from the user
table.
baby
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to indentify memory leakages after the build
How to find that tools work well with your existing system?
Explain what is exhaustive testing?
what are the responsibilities for QA tester to test application on UNIX environment??? what skills required for unix???
can anyone help me regarding testing patterns?
what the purpose of requirement phase
Explain accessibility testing and its importance in the present scenario.
What is mutation testing & when can it be done?
How to do manual testing of a E-insurance project (end to end process)
plz send the test scenarios and test cases for "user name should contain 4 to 8 chars and they should have only vowels"
how can we do database testing. In database testing we verify the data integrity and data validation. how can we do testing of Index, triggers, views, ransactions,cursors etc
In usability testing we check spelling, content, look and feel, color combination, link or menu navigation? please let me know more about usability testing.
Architectural structure of the insurance project?
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
What are the standard you follow in your company to prepare test plan document? Content is same in every standard or not. Also is there any document to read about the testing standards? Thanks in advance for giving me the answer.