Answer Posted / chandan
Testing a new or an alternate data processing system with
the same source data that is used in another system. The
other system is considered as the standard of comparison.
Syn: parallel run.[ISO]
| Is This Answer Correct ? | 18 Yes | 13 No |
Post New Answer View All Answers
is it not possible to automate full project??what r the parts in project that cant be automated(tht has to be done manually)?
Describe to me what you see as a process. Not a particular process, just the basics of having a process.
Can anybody give whole test cases for banking module.it should include from start to end .that will help me more.to do study.it should contain account,deposite,withdraw,fd,atm modules.?please try to give me??
What processes/methodologies are you familiar with?
What is the procedure of manual testing?
What is common interface?
1.How to maintain the Bug status Report? 2.What is project based Company and product based company?
What are the different ways to check a date field in a website?
what is entry and exit criteria and explain it?
What is concurrent user hits in load testing?
How can you do the usability testing?
When to stop testing? (Or) how do you decide when you have tested enough?
How do you scope out the size of the testing effort?
What is the difference between pilot and beta testing?
How do u determine,what to be tested?