Answer Posted / rohit
1. Raw Material/Semi finish
2. WIP ( Work in progress)
3. Finish material
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what is the meaning of exploding a bom?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What general data appears on basic data screen?
Explain the Difference between the Discreet and REM.
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
Explain In-process inspection.
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
In lsmw which is the most important step?
What is Backflush, the places where the backflush is used?
How to create object dependencies in a bom for a configurable material?
What is "work center" in sap pp and what is the use of data in work centers?
What are all the steps involved in Variant Configuration?
Can't one material be assigned to more than one operation in a routing?
What are gaps? Some examples?
SPRO path for order, confirmation or requirement class.