How can we search particular records from the database file
in RPG.
For example, there are
100 records in the file.i need to retrieve all the records
matching/equal to the particular 'NAME' field. How can we
do the above using SEARCH criteria other than using the IF
cond?

Answer Posted / maha

by using runqry *n file name rcdformat(*slt)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2146


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

618


what is the procedure and explain about real time scenario.

1567


How can we override a file during runtime in rpg?

785


give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........

3419






1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?

590


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1846


are there any useful c runtime apis that I can call from rpg iv?

785


What is the difference between iter and do?

795


What is the difference between copybooks and subprocedures in as400?

940


what is file information data structure?

1542


What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2603


can I touch the array during treatments?

847


what was the robotech rpg?

760


1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.

5659